Industry

Construction software for job management and site systems

Construction margins are thin enough that a fortnight of unpaid administration per project matters. Most of it is caused by information that lives on a phone, in a ute, or in someone's head.

What does High10 build for construction?

Construction software is the job management, tender, site capture and subcontractor systems that builders and trades use to run projects. In Australia that means progress claims under security of payment legislation, SWMS and white card records, and evidence that survives a National Construction Code inspection. It suits builders whose margin is being eaten by administration rather than by pricing.

Get a fixed written quote
Typical timeline
8 to 16 weeks
What drives cost
The number of distinct workflows, whether the mobile app has to work fully offline, how many existing systems it must integrate with.
Best for
Commercial builders, residential builders, trades and specialist subcontractors
You own
The application, the job data, the photo archive and the hosting
Built with
Offline first mobile capture, accounting integrations, document control

Your handover

What is actually broken on most construction jobs

The information exists. It is just scattered. Site photos sit in a foreman's camera roll, variations are agreed verbally and confirmed in a text message, the SWMS for a high risk activity is a PDF someone emailed in March, and the only complete record of who was on site last Tuesday is a paper sign in sheet in a folder in the site shed. When something goes wrong, whether that is a defect claim, a safety incident or a payment dispute, the business spends days reconstructing what it already knew at the time.

  1. 01Offline-capable site capture app for photos, diaries and sign on
  2. 02SWMS issue, acknowledgement and version control
  3. 03White card, licence and insurance expiry tracking
  4. 04Job cost tracking against budget in real time
  5. 05Progress claim assembly with evidence attached
  6. 06Tender and drawing portal with version control and download logs
  • Subcontractor onboarding and compliance register
  • Accounting and estimating integrations
  • Crew training on site and written administrator documentation
The second problem is the claim cycle

The second problem is the claim cycle. Progress claims get assembled at the end of the month from timesheets, delivery dockets and memory, then go out late, then get schedule of payments queries that take another week to answer because the supporting evidence has to be found again. Under security of payment legislation the timing of claims and payment schedules is strict and state specific, and a builder who is casual about dates gives up rights that exist to protect cash flow. None of this is a technology failure. It is an information capture failure, and it is fixable.

A variation with a written approval, a timestamped photo and a diary entry is not really arguable.

The compliance record a builder has to be able to produce

Australian construction runs on evidence. Under the model WHS Regulations a safe work method statement is required before high risk construction work starts, it has to be available on site, and it has to be reviewed when the work changes. General construction induction cards, commonly called white cards, need to be verified for every person on site, along with trade licences and, for subcontractors, currency of insurance and workers compensation. Inspection and test plans, hold points and compliance evidence tie back to the National Construction Code and the relevant Australian Standards.

The point is not that a system makes you compliant

State regimes add their own layers, including licensing through bodies such as the QBCC and the VBA, project trust and retention trust obligations, and different security of payment timeframes in each jurisdiction. The point is not that a system makes you compliant. It does not. The point is that when a regulator, a principal or an insurer asks for evidence, the difference between a builder who produces it in ten minutes and one who produces it in ten days is entirely a matter of whether capture was built into the daily routine or left as an end of week task nobody does.

  • White card, licence and insurance currency tracked with expiry alerts
  • SWMS issued, acknowledged and version controlled per activity
  • Site diary, inductions and sign on captured on a phone in seconds
  • Photos tagged to job, lot, date and location automatically
  • ITP and hold point sign offs recorded with the evidence attached
  • Variation approvals captured in writing before the work proceeds

How the engagement runs

How a construction project usually runs

We start on site, not in a workshop. An hour with a foreman and an hour with the person who assembles progress claims tells us more than a week of stakeholder meetings, because the workarounds people have invented are a precise map of what the system needs to do.

  1. 01Site visitWatch how information is captured now, including the paper and the text messages
  2. 02Claim cycle reviewTrace one full progress claim from timesheet to payment and record every delay
  3. 03Scope by stageAgree what ships first based on cash flow impact rather than on feature count
  4. 04Build site captureOffline first, few taps, works with gloves and cracked screens
  5. 05Build the office sideJob costing, claim assembly, subcontractor compliance and document control
  6. 06IntegrateAccounting, estimating and any existing job management platform
  7. 07Roll out crew by crewTrain on site, fix what annoys people in the first fortnight, then expand
DiscoverDesignBuildTestHandover
Two decisions on your side that keep the project moving

We then build in stages that each deliver something usable. Site capture first, because it starts producing the evidence base immediately and the crew adoption question gets answered early. If the crew will not use it in week two, no amount of later functionality saves the project, and it is far better to learn that with one module built than with six.

What we build for builders and trades

Most of our construction work falls into four buckets. Job and project tracking that gives a real time view of cost against budget rather than a picture of last month. Site capture apps that work offline, because a basement in Parramatta and a subdivision outside Toowoomba have the same reception problem. Tender and document portals so drawings, addenda and returnable schedules are distributed with version control and a record of who downloaded what. And subcontractor management covering onboarding, compliance documents, purchase orders and payment claims.

The rest of the answer

Where an off-the-shelf product covers you, we will say so. Plenty of builders run well on established job management platforms, and replacing one with a custom build is rarely justified. The work we take on is usually the gap the product leaves: a pricing model nobody else supports, an integration between estimating and accounting that does not exist, or a client facing portal the platform cannot provide. That is custom software and mobile app territory, often with integration work joining it to what you already run.

Getting paid faster is a systems problem

Cash flow is the constraint in most construction businesses, and the claim cycle is where a system pays for itself fastest. If daily site records, variations, delivery dockets and photos are captured as the work happens, a progress claim becomes an assembly job rather than an investigation. Claims go out on the due date with the evidence already attached, which removes the most common reason for a payment schedule dispute.

The same data solves the arguments that follow

The same data solves the arguments that follow. A variation with a written approval, a timestamped photo and a diary entry is not really arguable. A verbal instruction remembered differently by two people always is. We build the capture so that the evidence exists by default, then automate the reminders, escalations and document assembly around the statutory dates in your state. That side is usually workflow automation, and it sits alongside a client or principal portal where approvals happen in one place with a timestamp.

When a custom build is the wrong answer

If you run two crews and a whiteboard works, keep the whiteboard. If an established job management platform covers eighty percent of your process and the remaining twenty percent is habit rather than necessity, changing the habit is cheaper than building software. We have talked builders out of custom projects on exactly that basis, because a system nobody wanted to use is worse than the spreadsheet it replaced.

Suppliers and manufacturers serving the sector should look at our manufacturing page instead

Custom is justified when the mismatch is structural: your commercial model is genuinely unusual, you need a client facing experience no product offers, or you are stitching together several systems and the integration layer has become the actual product. If what you really need is more of the right enquiries rather than better administration, start with local search and a site that shows the work properly. Suppliers and manufacturers serving the sector should look at our manufacturing page instead.

Everything included

The handover checklist

The practical artefacts your team or your development partner receives when this phase is complete.

  • Offline-capable site capture app for photos, diaries and sign on
  • SWMS issue, acknowledgement and version control
  • White card, licence and insurance expiry tracking
  • Job cost tracking against budget in real time
  • Progress claim assembly with evidence attached
  • Tender and drawing portal with version control and download logs
  • Subcontractor onboarding and compliance register
  • Accounting and estimating integrations
  • Crew training on site and written administrator documentation

Not sure which level you need?

A 45 minute call, no cost, no obligation. You leave with a scope, an honest timeline and a fixed written quote.

Book a strategy call

Questions buyers usually ask

Frequently asked questions

Cost and quoting

What drives the cost of construction software?

The number of distinct workflows, whether the mobile app has to work fully offline, how many existing systems it must integrate with, and how unusual your commercial model is. Offline capability and accounting integration are the two that most often surprise people, because both add real engineering. We scope in stages and send a fixed written quote per stage so you can sequence by cash flow impact.

Does this make us compliant with WHS and security of payment obligations?

No system makes you compliant, and any supplier who says otherwise is overselling. What it does is make compliance the default path: SWMS acknowledged before work starts, cards and licences checked at induction, evidence captured as the job runs, and claim dates tracked against the timeframes in your state. When someone asks for records, you produce them in minutes instead of days.

Detail and edge cases

How long does a construction system take to build?

Typically 8 to 16 weeks for a first usable release, then staged additions. We deliberately ship site capture early, often within the first six weeks, because it starts producing evidence straight away and tests crew adoption while the rest is still being built. Full job costing, claim assembly and subcontractor compliance usually land across the following two to three months.

Will our crews actually use it?

Only if it is faster than what they do now, which is the design constraint we work to. That means offline first, large touch targets for gloved hands, capture in a few taps, and no field that is not genuinely needed. We roll out crew by crew and fix the irritations in the first fortnight. Adoption is a design problem, not a training problem.

Can it work with our existing accounting or job management platform?

Usually, yes. We integrate with common Australian accounting systems and with established job management platforms rather than assuming you will replace them. The first question we ask is which system owns each piece of truth, because ambiguity there is what makes integrations fail quietly. That gets documented before any connector is written.

What happens to the data if we stop working with you?

You keep everything. The application code, the job database, the photo archive and the hosting account are yours and are registered to your business. Photo archives in particular tend to grow large and matter for years because of defect liability periods, so we design the export path at the start rather than treating it as an afterthought.

Tell us where the administration is going

Describe how a progress claim gets assembled today and what happens when a variation is disputed. We reply within one business day with an approach and a fixed written quote.